Intro

The following study test contains practice certification questions along with a study link for each question.  These questions were prepared by Mike Prestwood and are intended to stress an important aspect. All our practice questions are intended to prepare you specifically to earn your Prestwood certification and generally for passing any certification test as well as prepare you for professional work.

Features:

  • Each question has a popup [Review] link.
  • Hover over answers to reveal correct answer.

4 Questions


Mouse over answers to reveal correct answer.

Beginner

2 Beginner Level Questions

Question #1: Multiple Choice

What is a PSDP checkpoint?

Answer:
1. 

A checkpoint is a milestone.

2. 

A checkpoint is a task.

3. 

A checkpoint is a requirement item.

4. 

All of the above.

5. 

None of the above.

Question #2: Multiple Choice

In a multi-developer team, two design documents have been created. One of the official, the other was created by another developer. In general, the official design document is a high level document and the developer document is more detailed. However, the documents contain conflicting information. What should you do?

Answer:
1. 

Because it is a multi-developer team and because the documents contain conflicting information, the documents MUST be merged.

2. 

No action is required because PSDP allows for the flexibility to use whatever documentation you want.

3. 

With the robust path, you have the option of not updating the design documents throughout the project.

4. 

With the informal path, you must update the design documents throughout the project.


Intermediate

2 Intermediate Level Questions

Question #3: Multiple Choice

Checkpoints...

Answer:
1. 

...are decided upon by the project manager and client.

2. 

 ...are used to watch the progress of a project.

3. 

...are used to group tasks by milestones.

4. 

...are used to track progress.

5. 

All of the above.

Question #4: Multiple Choice

What is a PSDP artifact?

Answer:
1. 

A PSDP artifact is a deliverable.

2. 

A PSDP artifact links together a task, requirement item, design item, and test script all with the same name and associated with the same project category (if used).

3. 

A PSDP artifact is a document.

4. 

A PSDP artifact links together a build, defect, and test script all with the same name and associated with the same project category (if used).

5. 

None of the above.


Follow PrestwoodBoards on: 


©1995-2019 PrestwoodBoards  [Security & Privacy]
Professional IT Services: Coding | Websites | Computer Tech